SATURN D6.2 - Communication and Dissemination Report
Tanner, G. 2014. SATURN D6.2 - Communication and Dissemination Report.
Tanner, G. 2014. SATURN D6.2 - Communication and Dissemination Report.
Title | SATURN D6.2 - Communication and Dissemination Report |
---|---|
Authors | Tanner, G. |
Type | Project report |
Abstract | This report summarises the SATURN project’s targeted communication and dissemination activities up to the project mid-point, between two stakeholder consultation workshops. These current and planned activities have been reported in the quarterly progress reports. This document updates the information and provides further details. |
Year | 2014 |
Page range | 1-45 |
Web address (URL) | http://www.saturn-sesar.eu/ |
European performance assessment –challenges and concepts
Cook, A.J., Delgado, L., Tanner, G., Gurtner, G. and Bolic, T. 2023. European performance assessment –challenges and concepts.
Engage D1.2 Final Project Results Report
Tanner, G. and Cook, A.J. 2022. Engage D1.2 Final Project Results Report. SESAR.
Engage D5.14 Engage SESAR Summer School 2021
Castelli, L., Tanner, G. and Cook, A.J. 2022. Engage D5.14 Engage SESAR Summer School 2021. SESAR.
Engage D5.6 Thematic challenge briefing notes (1st and 2nd releases)
Tanner, G. and Cook, A.J. 2022. Engage D5.6 Thematic challenge briefing notes (1st and 2nd releases). SESAR.
Engage D2.2 Final Communication and Dissemination Report
Gomez, I., Tanner, G., Lopez-Catala, P. and Cook, A.J. 2022. Engage D2.2 Final Communication and Dissemination Report. SESAR.
Engage D2.11 11th SESAR Innovation Days report
Schaefer, D., Tanner, G. and Cook, A.J. 2022. Engage D2.11 11th SESAR Innovation Days report. SESAR.
Engage D3.2 Final workshop presentations of wave 2 catalyst-funded projects
Tanner, G., Cook, A.J. and Bolic, T. 2022. Engage D3.2 Final workshop presentations of wave 2 catalyst-funded projects. SESAR.
Dispatcher3 D7.2 - Project communication, dissemination and exploitation rreport
Delgado, L., Tanner, G., Gomez, I. and Argerich Martin, C. 2022. Dispatcher3 D7.2 - Project communication, dissemination and exploitation rreport.
Engage – the SESAR 2020 KTN: innovation, impact and legacy
Cook, A.J., Bolic, T. and Tanner, G. 2022. Engage – the SESAR 2020 KTN: innovation, impact and legacy. Webinar for SESAR Joint Undertaking. Brussels (hybrid) 03 Oct 2022
Engage D3.9 The Engage wiki - an update on the KTN's knowledge hub functionality, research maps and repository
Hernandez, P., Gomez, I., Tanner, G., Cook, A.J., Sun, J., Mirkovic, B. and Bolic, T. 2022. Engage D3.9 The Engage wiki - an update on the KTN's knowledge hub functionality, research maps and repository. SESAR.
Engage D3.10 Research and innovation insights
Cook, A.J., Schaefer, D., Bourgois, M., Hernandez, P., Tanner, G. and Bolic, T. 2022. Engage D3.10 Research and innovation insights. SESAR.
Engage D5.15 Production of three-part introductory courses
Jovanovic, R., Tanner, G. and Cook, A.J. 2021. Engage D5.15 Production of three-part introductory courses. SESAR.
Engage D2.6 Annual combined thematic workshops progress report (series 2)
Bolic, T., Cook, A.J., Hernandez, P., Lopez-Catala, P., Schaefer, D., Delgado, L. and Tanner, G. 2021. Engage D2.6 Annual combined thematic workshops progress report (series 2). SESAR.
Engage D3.8 Mapping ATM research concepts, past and future - including the Engage wiki implementation
Tanner, G., Hernandez, P., Sun, J., Gomez, I., Bolic, T., Lopez-Catala, P. and Cook, A.J. 2021. Engage D3.8 Mapping ATM research concepts, past and future - including the Engage wiki implementation. SESAR.
Engage D2.10 10th SESAR Innovation Days report
Schaefer, D. and Tanner, G. 2021. Engage D2.10 10th SESAR Innovation Days report. SESAR.
Engage D3.1 Final workshop presentations of wave 1 catalyst-funded projects
Bolic, T. and Tanner, G. 2021. Engage D3.1 Final workshop presentations of wave 1 catalyst-funded projects. SESAR.
Engage D2.7 Annual combined thematic workshops progress report (series 3)
Bolic, T., Schaefer, D., Cook, A.J. and Tanner, G. 2021. Engage D2.7 Annual combined thematic workshops progress report (series 3). SESAR.
Engage D5.13 Engage SESAR Summer School 2020
Jovanovic, R., Tanner, G. and Cook, A.J. 2020. Engage D5.13 Engage SESAR Summer School 2020. SESAR.
Engage D5.12 Engage SESAR Summer School 2019
Jovanovic, R., Tanner, G. and Cook, A.J. 2020. Engage D5.12 Engage SESAR Summer School 2019. SESAR.
Engage D3.7 Update on the Engage repository and knowledge hub functionality (initial)
Gomez, I., Lopez-Catala, P., Tanner, G. and Cook, A.J. 2020. Engage D3.7 Update on the Engage repository and knowledge hub functionality (initial). SESAR.
Engage D2.9 9th SESAR Innovation Days report
Schaefer, D. and Tanner, G. 2020. Engage D2.9 9th SESAR Innovation Days report. SESAR.
Dispatcher3 D8.1 - Project management plan
Delgado, L., Tanner, G. and Valput, D. 2020. Dispatcher3 D8.1 - Project management plan.
Pilot3 D8.2 - Proof of signature of Implementation Agreement / SPD Consortium Agreement / Internal Consortium Agreement
Delgado, L. and Tanner, G. 2020. Pilot3 D8.2 - Proof of signature of Implementation Agreement / SPD Consortium Agreement / Internal Consortium Agreement.
Domino D1.2 - Final Project Results Report
Delgado, L., Gurtner, G., Cook, A.J. and Tanner, G. 2020. Domino D1.2 - Final Project Results Report. SESAR.
Engage D5.3 Postgraduate research and events database (initial version)
Bolic, T., Castelli, L., Cook, A.J., Tanner, G., Lopez-Catala, P., Trausmuth, G., Mirkovic, B. and Netjasov, F. 2019. Engage D5.3 Postgraduate research and events database (initial version). SESAR.
Engage D5.1 University programme database (initial version)
Bolic, T., Castelli, L., Cook, A.J., Tanner, G., Lopez-Catala, P., Jovanovic, R., Mirkovic, B. and Netjasov, F. 2019. Engage D5.1 University programme database (initial version). SESAR.
Engage D2.5 Annual combined thematic workshops progress report (priming wave 1)
Bolic, T., Cook, A.J., Castelli, L., Jovanovic, R., Lopez-Catala, P., Schaefer, D. and Tanner, G. 2019. Engage D2.5 Annual combined thematic workshops progress report (priming wave 1). SESAR.
Engage D3.5 Opportunities for innovative ATM research (interim report)
Schaefer, D., Bourgois, M., Hullah, P. and Tanner, G. 2019. Engage D3.5 Opportunities for innovative ATM research (interim report). SESAR.
Engage D2.8 8th SESAR Innovation Days report
Schaefer, D. and Tanner, G. 2019. Engage D2.8 8th SESAR Innovation Days report. SESAR.
Domino D3.3 - Adaptive case studies description
Delgado, L., Gurtner, G., Zaoli, S., Mazzarisi, P., Valput, D., Tanner, G., Cook, A.J. and Lillo, F. 2019. Domino D3.3 - Adaptive case studies description.
Domino D6.3 - Workshop results summary
Delgado, L., Gurtner, G., Cook, A.J. and Tanner, G. 2019. Domino D6.3 - Workshop results summary. SESAR.
Domino D5.2 - Investigative case studies results
Lillo, F., Mazzarisi, P., Zaoli, S., Delgado, L., Gurtner, G., Valput, D., Cook, A.J. and Tanner, G. 2019. Domino D5.2 - Investigative case studies results. SESAR.
Engage D2.1 Communication plan, website, and visual identity material
Ureta, H., Gomez, I., Lopez-Catala, P. and Tanner, G. 2018. Engage D2.1 Communication plan, website, and visual identity material. SESAR.
Engage D3.4 Thematic challenges priming report for first workshops
Schaefer, D., Tanner, G. and Cook, A.J. 2018. Engage D3.4 Thematic challenges priming report for first workshops. SESAR.
Vista D6.3 - Stakeholder consultation on initial assessment
Delgado, L., Gurtner, G. and Tanner, G. 2018. Vista D6.3 - Stakeholder consultation on initial assessment. SESAR.
Domino D6.2 - Stakeholders' consultation on system and investigative case studies
Delgado, L., Tanner, G., Gurtner, G. and Cook, A.J. 2018. Domino D6.2 - Stakeholders' consultation on system and investigative case studies.
Domino D3.2 - Investigative case studies description
Delgado, L., Gurtner, G., Cook, A.J., Pilon, N. and Tanner, G. 2018. Domino D3.2 - Investigative case studies description.
Domino D4.1 - Initial model design
Delgado, L., Gurtner, G., Cook, A.J., Pilon, N., Valput, D., Cristobal, S. and Tanner, G. 2018. Domino D4.1 - Initial model design.
Vista D1.2 - Final Project Results Report
Cook, A.J., Gurtner, G., Delgado, L. and Tanner, G. 2018. Vista D1.2 - Final Project Results Report. SESAR.
D2.1 – Establishment of Performance Framework
Cook, A.J., Tanner, G., Gurtner, G., Delgado, L. and Cristobal, S. 2018. D2.1 – Establishment of Performance Framework. http://h2020camera.eu/ Innaxis.
Domino D6.2 - Stakeholders' consultation on system and investigative case studies
Delgado, L., Gurtner, G., Tanner, G. and Cook, A.J. 2018. Domino D6.2 - Stakeholders' consultation on system and investigative case studies.
Domino D3.1 - Architecture definition
Delgado, L., Gurtner, G., Valput, D., Pilon, N., Guichard, L., Cook, A.J. and Tanner, G. 2018. Domino D3.1 - Architecture definition.
Domino D2.1 - Data management and sources
Bolic, T., Castelli, L., Delgado, L., Gurtner, G., Tanner, G. and Cook, A.J. 2018. Domino D2.1 - Data management and sources.
Domino D6.1 - Dissemination plan and project visual identity
Ureta, H., Gomez, I., Tanner, G., Delgado, L., Guichard, L., Bolic, T., Lillo, F. and Cook, A.J. 2018. Domino D6.1 - Dissemination plan and project visual identity.
Domino D1.1 - Project Management Plan
Delgado, L., Gurtner, G., Tanner, G., Cook, A.J., Guichard, L., Bolic, T., Lillo, F. and Cristobal, S. 2018. Domino D1.1 - Project Management Plan.
Vista D6.2 - Stakeholder Consultation on Business and Regulatory Scenarios
Delgado, L., Gurtner, G. and Tanner, G. 2017. Vista D6.2 - Stakeholder Consultation on Business and Regulatory Scenarios.
DATASET2050 D5.2 - Assessment execution
Cook, A.J., Tanner, G., Gurtner, G., Ureta, H., Cristobal, S., Belkoura, S., Gómez, I., Paul, A., Kluge, U. and Hullah, P. 2017. DATASET2050 D5.2 - Assessment execution.
DATASET2050 D5.1 - Mobility assessment
Hullah, P., Kirby, S., Cook, A.J., Tanner, G., Gurtner, G., Ureta, H., Cristobal, S. and Gómez, I. 2017. DATASET2050 D5.1 - Mobility assessment.
Managing dwell times – a key challenge for the D2D target
Cook, A.J. and Tanner, G. 2017. Managing dwell times – a key challenge for the D2D target. SESAR Innovation Days 2017 - DATASET2050 workshop. Belgrade, Serbia 27 Nov 2017 Innaxis.
DATASET2050 D4.2 - Future Supply Profile
Cook, A.J. and Tanner, G. 2017. DATASET2050 D4.2 - Future Supply Profile. Innaxis.
DATASET2050 D3.2 - Future Passenger Demand Profile
Paul, A., Kluge, U., Mennig, P., Ureta, H., Tanner, G., Cook, A.J. and Hullah, P. 2017. DATASET2050 D3.2 - Future Passenger Demand Profile. Innaxis.
ComplexityCosts D4.5 - Final Technical Report
Delgado, L., Cristobal, S., Cook, A.J. and Tanner, G. 2016. ComplexityCosts D4.5 - Final Technical Report.
ComplexityCosts D3.2 - Investment trade-offs
Delgado, L., Cristobal, S., Cook, A.J., Tanner, G. and Schultz, M. 2016. ComplexityCosts D3.2 - Investment trade-offs.
DATASET2050 D4.1 - Current Supply Profile
Cook, A.J. and Tanner, G. 2016. DATASET2050 D4.1 - Current Supply Profile. Innaxis.
DATASET2050 D3.1 - Current Passenger Demand Profile
Cook, A.J. and Tanner, G. 2016. DATASET2050 D3.1 - Current Passenger Demand Profile. Innaxis.
DATASET2050 D2.1 - Data Requirements and Acquisition
Cook, A.J. and Tanner, G. 2016. DATASET2050 D2.1 - Data Requirements and Acquisition. Innaxis.
DATASET2050 D4.1 - Current Supply Profile
Hullah, P., Kirby, S., Ureta, H., Cook, A.J., Tanner, G., Graham, A., Rothfeld, R. and Paul, A. 2016. DATASET2050 D4.1 - Current Supply Profile.
SATURN D6.5 - Final Report
Babić, O., Bolić, T., Castelli, L., Cook, A.J., Corolli, L., Costanzo, S., Jovanović, R., Marcotte, E., Rigonat, D., Tanner, G., Tošić, V. and Živanović, M. 2016. SATURN D6.5 - Final Report.
DATASET2050 D4.2 - Future supply profile
Tanner, G., Cook, A.J., Gurtner, G., Graham, A., Delgado, L., Cristobal, S., Ureta, H., Paul, A., Kluge, U., Mennig, P. and Hullah, P. 2016. DATASET2050 D4.2 - Future supply profile.
DATASET2050 D2.1 - Data requirements and acquisition
Tanner, G., Cook, A.J., Delgado, L., Graham, A., Cristobal, S., Ureta, H. and Paul, A. 2016. DATASET2050 D2.1 - Data requirements and acquisition.
Quantifying resilience in ATM - contrasting the impacts of four mechanisms during disturbance
Delgado, L., Cook, A.J., Tanner, G. and Cristobal, S. 2016. Quantifying resilience in ATM - contrasting the impacts of four mechanisms during disturbance. Schaefer, D. (ed.) Sixth SESAR Innovation Days. Delft, Netherlands 08 - 10 Nov 2016 SESAR.
Measuring the cost of resilience
Cook, A.J., Delgado, L., Tanner, G. and Cristobal, S. 2016. Measuring the cost of resilience. Journal of Air Transport Management. 56 (A), pp. 38-47. https://doi.org/10.1016/j.jairtraman.2016.02.007
ComplexityCosts D3.1 - Scenario Definition
Delgado, L., Cook, A.J., Tanner, G., Cristobal, S. and Schultz, M. 2015. ComplexityCosts D3.1 - Scenario Definition.
ComplexityCosts D2.2 - Model Implementation
Cristobal, S., Delgado, L., Tanner, G., Cook, A.J., Pérez, D. and Montlaur, A. 2015. ComplexityCosts D2.2 - Model Implementation.
ComplexityCosts D2.1 - Theoretical Stochastic Layered Network Model
Blanch, A., Cook, A.J., Cristobal, S., Delgado, L., Fürstenau, N. and Tanner, G. 2015. ComplexityCosts D2.1 - Theoretical Stochastic Layered Network Model.
The cost of passenger delay to airlines in Europe - consultation document
Cook, A.J. and Tanner, G. 2015. The cost of passenger delay to airlines in Europe - consultation document.
SATURN D4.2 - Pure Pricing Mechanisms
Andrić, V., Babić, O., Bolić, T., Castelli, L., Costanzo, S., Jovanović, R., Labbé, M., Marcotte, E., Rigonat, D., Tanner, G., Tošić, V., Violin, A. and Živanović, M. 2015. SATURN D4.2 - Pure Pricing Mechanisms.
SATURN D1.2 - Data Management (update report)
Andrić, V., Babić, O., Castelli, L., Corolli, L., Delgado, L., Ivanov, N., Jovanović, R., Marcotte, E., Netjasov, F., Rigonat, D., Tanner, G., Tošić, V. and Živanović, M. 2015. SATURN D1.2 - Data Management (update report).
Modulation of en-route charges to redistribute traffic in the European airspace
Castelli, L., Bolić, T., Costanzo, S., Rigonat, D., Marcotte, E. and Tanner, G. 2015. Modulation of en-route charges to redistribute traffic in the European airspace. Schaefer, D. (ed.) Fifth SESAR Innovation Days. Bologna 01 - 03 Dec 2015 SESAR.
European airline delay cost reference values
Cook, A.J. and Tanner, G. 2015. European airline delay cost reference values. Brussels EUROCONTROL Performance Review Unit.
Delay propagation – new metrics, new insights
Cook, A.J., Tanner, G., Cristobal, S. and Zanin, M. 2015. Delay propagation – new metrics, new insights. Eleventh USA/Europe Air Traffic Management Research and Development Seminar . Lisbon 23 - 26 Jun 2015 EUROCONTROL/FAA.
ComplexityCosts D4.3 - Communication and Dissemination Report
Cook, A.J. and Tanner, G. 2014. ComplexityCosts D4.3 - Communication and Dissemination Report.
ComplexityCosts D1.3 - Interim data requirements and scoping
Cook, A.J., Blanch, A., Cristobal, S., Delgado, L., Förster, P., Straube, K. and Tanner, G. 2014. ComplexityCosts D1.3 - Interim data requirements and scoping.
ComplexityCosts D1.2 - Design mechanisms and cost allocations
Cook, A.J., Blanch, A., Cristobal, S., Delgado, L., Förster, P., Pérez, D. and Tanner, G. 2014. ComplexityCosts D1.2 - Design mechanisms and cost allocations.
ComplexityCosts D1.1 - Update on the state of the art
Cook, A.J., Cristobal, S., Förster, P. and Tanner, G. 2014. ComplexityCosts D1.1 - Update on the state of the art.
SATURN D3.1 - Pricing mechanisms
Babić, O., Bolić, T., Castelli, L., Corolli, L., Ivanov, N., Jovanović, R., Marcotte, E., Netjasov, F., Rigonat, D., Scarcia, A., Tanner, G., Tošić, V. and Živanović, M. 2014. SATURN D3.1 - Pricing mechanisms.
SATURN D2.1 - Future airspace congestion - a users' discussion guide
Babić, O., Bolić, T., Castelli, L., Cook, A.J., Corolli, L., Delgado, L., Jovanović, R., Labbé, M., Lazarević, M., Marcotte, E., Netjasov, F., Rigonat, D., Tanner, G. and Tošić, V. 2014. SATURN D2.1 - Future airspace congestion - a users' discussion guide.
SATURN D1.1 - Data Management (main report)
Babić, O., Bolić, T., Castelli, L., Cook, A.J., Delgado, L., Ivanov, N., Jovanović, R., Marcotte, E., Rigonat, D., Tanner, G. and Tošić, V. 2014. SATURN D1.1 - Data Management (main report).
Better Pricing Strategies for ATM?
Bolić, T, Rigonat, D, Castelli, L, Jovanović, R, Cook, A.J. and Tanner, G. 2014. Better Pricing Strategies for ATM? Schaefer, D. (ed.) Fourth SESAR Innovation Days. Madrid 25 - 27 Nov 2014 SESAR.
CASSIOPEIA D4.3 - case study 3 report: hub connectivity-driven variable aircraft speeds
Tanner, G., Blanch, A., Martín, J. and Cook, A.J. 2013. CASSIOPEIA D4.3 - case study 3 report: hub connectivity-driven variable aircraft speeds.
POEM Final Technical Report
Cook, A.J., Tanner, G., Cristobal, S. and Zanin, M. 2013. POEM Final Technical Report. SESAR.
New perspectives for air transport performance
Cook, A.J., Tanner, G., Cristobal, S. and Zanin, M. 2013. New perspectives for air transport performance. Schaefer, D. (ed.) Third SESAR Innovation Days. Stockholm 26 - 28 Nov 2013 SESAR.
Towards superior air transport performance metrics – imperatives and methods
Cook, A.J. and Tanner, G. 2013. Towards superior air transport performance metrics – imperatives and methods. Journal of Aerospace Operations. 2, pp. 3-19. https://doi.org/10.3233/AOP-130032
The hidden cost of airline unpunctuality
Cook, A.J., Tanner, G. and Lawes, A. 2012. The hidden cost of airline unpunctuality. Journal of Transport Economics and Policy. 46 (2), pp. 157-173.
Passenger-Oriented Enhanced Metrics
Cook, A.J., Tanner, G., Cristobal, S. and Zanin, M. 2012. Passenger-Oriented Enhanced Metrics. Schaefer, D (ed.) Second SESAR Innovation Days. Braunschweig 27 - 29 Nov 2012 SESAR.
D6.1 POEM stakeholder feedback on design.
Tanner, G., Cook, A.J., Blanch, A. and Cristobal, S. 2012. D6.1 POEM stakeholder feedback on design. Eurocontrol.
D3.1 The design of propagation- and passenger-oriented metrics
Cook, A.J., Tanner, G. and Zanin, M. 2012. D3.1 The design of propagation- and passenger-oriented metrics. Eurocontrol.
A quantitative exploration of flight prioritisation principles, using new delay costs
Cook, A.J. and Tanner, G. 2012. A quantitative exploration of flight prioritisation principles, using new delay costs. Journal of Aerospace Operations. 1 (3), pp. 195-211. https://doi.org/10.3233/AOP-2012-0018
D2.1 Design of the model scenarios
Blanch, A., Zanin, M., Cristobal, S., Perez, D., Loadman, J., Lloret, J., Cook, A.J. and Tanner, G. 2012. D2.1 Design of the model scenarios. Eurocontrol.
D2.1A Logical architecture
Blanch, A., Zanin, M., Cristobal, S., Perez, D., Gonzalez, Y., Loadman, J., Lloret, J., Cook, A.J., Tanner, G., Benito, A., Lansorena, I. and Molina, M. 2012. D2.1A Logical architecture. Eurocontrol.
D1.2 Passenger and traffic data input to model
Tanner, G., Cook, A.J., Blanch, A. and Cristobal, S. 2011. D1.2 Passenger and traffic data input to model. Eurocontrol.
D4.1 The preliminary POEM network model
Cristobal, S., Blanch, A., Cook, A.J. and Tanner, G. 2011. D4.1 The preliminary POEM network model. Eurocontrol.
D5.1 Design of the analysis plan
Cook, A.J., Zanin, M. and Tanner, G. 2011. D5.1 Design of the analysis plan. Eurocontrol.
D1.1 Passenger and traffic data specification
Cook, A.J., Tanner, G., Cristobal, S. and Zanin, M. 2011. D1.1 Passenger and traffic data specification. Eurocontrol.
Modelling the airline costs of delay propagation
Cook, A.J. and Tanner, G. 2011. Modelling the airline costs of delay propagation. AGIFORS Airline Operations Conference. London, United Kingdom 16th - 19th May 2011
European airline delay cost reference values
Cook, A.J. and Tanner, G. 2011. European airline delay cost reference values. EUROCONTROL Performance Review Unit.
D1.2 High-level functional specification: model outputs
Cook, A.J. and Tanner, G. 2011. D1.2 High-level functional specification: model outputs. Eurocontrol.
D1.1 High-level functional specification: model inputs
Cook, A.J. and Tanner, G. 2011. D1.1 High-level functional specification: model inputs. Eurocontrol.
Trajectory planning: where next?
Tanner, G. 2010. Trajectory planning: where next? 9th EUROCONTROL Innovative Research Workshop & Exhibition. Brétigny sur Orge, France 7th - 9th December 2010
Quantifying airline delay costs - the balance between strategic and tactical costs
Cook, A.J., Tanner, G. and Enaud, P. 2010. Quantifying airline delay costs - the balance between strategic and tactical costs. 14th Air Transport Research Society (ATRS) World Conference. Porto, Portugal 06 - 09 Jul 2010
The cost of delay to air transport in Europe: quantification and management
Cook, A.J., Tanner, G., Jovanovic, R. and Lawes, A. 2009. The cost of delay to air transport in Europe: quantification and management. 13th Air Transport Research Society (ATRS) World Conference. Abu Dhabi, UAE 27th - 30th June 2009
The challenge of managing airline delay costs
Cook, A.J. and Tanner, G. 2009. The challenge of managing airline delay costs. German Aviation Research Society and University of Belgrade, Conference on Air Traffic Management Economics. University of Belgrade, Serbia 10th - 11th September 2009
Dynamic cost indexing: managing airline delay costs
Cook, A.J., Tanner, G., Williams, V. and Meise, G. 2009. Dynamic cost indexing: managing airline delay costs. Journal of Air Transport Management. 15 (1), pp. 26-35. https://doi.org/10.1016/j.jairtraman.2008.07.001
Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Electronic prototype of a dynamic cost indexing tool
Cook, A.J. and Tanner, G. 2008. Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Electronic prototype of a dynamic cost indexing tool. Deliverable (prototype tool), EUROCONTROL Experimental Centre.
Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Airline costs of delayed passengers and how to estimate full network delay costs
Cook, A.J. and Tanner, G. 2008. Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Airline costs of delayed passengers and how to estimate full network delay costs. Transport Studies Group, University of Westminster. https://doi.org/TechnicalDiscussionDocument6.0
Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Aircraft crewing – marginal delay costs
Cook, A.J. and Tanner, G. 2008. Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Aircraft crewing – marginal delay costs. Transport Studies Group, University of Westminster. https://doi.org/TechnicalDiscussionDocument5.0
Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Aircraft maintenance – marginal delay costs
Cook, A.J. and Tanner, G. 2008. Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Aircraft maintenance – marginal delay costs. Transport Studies Group, University of Westminster. https://doi.org/TechnicalDiscussionDocument9.0
Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Including climate impacts of NOx in a Dynamic Cost Indexing
Cook, A.J., Williams, V. and Tanner, G. 2008. Innovative Cooperative Actions of R&D in EUROCONTROL Programme CARE INO III: Dynamic Cost Indexing: Including climate impacts of NOx in a Dynamic Cost Indexing. EUROCONTROL Experimental Centre.
DISTILLATE: A KonSULT-based strategy option generator
Kelly, C., May, A., Jopson, A., Gawthorpe, S., Cook, A.J. and Tanner, G. 2008. DISTILLATE: A KonSULT-based strategy option generator. KonSULT.
Understanding and managing the costs of delay to airlines
Cook, A.J., Tanner, G., Williams, V. and Meise, G. 2008. Understanding and managing the costs of delay to airlines. NATS Workshop. NATS Corporate and Technical Centre, Swanwick 02 Jul 2008
Understanding and managing the costs of delay to airlines
Cook, A.J., Tanner, G., Williams, V. and Meise, G. 2008. Understanding and managing the costs of delay to airlines. EUROCONTROL Innovative Research Workshop. EUROCONTROL Experimental Centre, Brétigny sur Orge, France 17 June 2008
Dynamic cost indexing: cost estimations and building the prototype
Cook, A.J., Tanner, G., Williams, V. and Meise, G. 2008. Dynamic cost indexing: cost estimations and building the prototype. 7th EUROCONTROL Innovative Research Workshop & Exhibition. EUROCONTROL Experimental Centre 2 - 4 Dec 2008
Managing the Acceptance of Change in ATM
Cook, A.J. and Tanner, G. 2008. Managing the Acceptance of Change in ATM. Air Traffic Control Quarterly. 16 (3), pp. 235-254.
Dynamic cost indexing
Cook, A.J. and Tanner, G. 2008. Dynamic cost indexing. European ATM Innovation Symposium. University of Southampton 16 Jan 2008
Attitudes to change in ATM operations: introduction of CDA trials at Manchester, Bucharest, and Stockholm
Cook, A.J. and Tanner, G. 2007. Attitudes to change in ATM operations: introduction of CDA trials at Manchester, Bucharest, and Stockholm. Brussels, Belgium European Organisation for the Safety of Air Navigation. https://doi.org/EECNote2007-08
The principles of flight planning and ATM messaging
Tanner, G. 2007. The principles of flight planning and ATM messaging. in: Cook, A.J. (ed.) European air traffic management: principles, practice, and research Aldershot Ashgate. pp. 35-64
Option generation tools for sustainable urban transport strategies
May, A., Jopson, A., Gawthorpe, S., Kelly, C., Cook, A.J. and Tanner, G. 2007. Option generation tools for sustainable urban transport strategies. 11th World Conference on Transportation Research. Berkeley, USA 24 - 29 Jun 2007
Dynamic cost indexing
Cook, A.J., Tanner, G., Williams, V. and Meise, G. 2007. Dynamic cost indexing. 6th EUROCONTROL Innovative Research Workshops & Exhibition. EUROCONTROL Experimental Centre, Brétigny sur Orge, France 04 - 06 Dec 2007
A psychosocial approach to understanding pilot and controller acceptance of change in ATM, based on three CDA case studies
Cook, A.J., Tanner, G., Pilon, N. and Joyce, T. 2007. A psychosocial approach to understanding pilot and controller acceptance of change in ATM, based on three CDA case studies. 7th USA/Europe Air Traffic Management R&D Seminar. Barcelona, Spain 02 - 05 Jul 2007 EUROCONTROL/FAA.
VANTAGE Phase 1, Traffic Flow Model
Cook, A.J., Tanner, G. and Dennis, N. 2007. VANTAGE Phase 1, Traffic Flow Model. University of Westminster. https://doi.org/BERRProjectNo:TP/3/DSM/6/I/15530;DeliverableVANTAGE-UOW-4220-DD-08
"Citizens" study: results of European focus groups examining public perceptions of air transport growth and ATM
Cook, A.J. and Tanner, G. 2005. "Citizens" study: results of European focus groups examining public perceptions of air transport growth and ATM. London, UK EUROCONTROL Experimental Centre. https://doi.org/EEC/SEE/2005/013
Attitudes t societal demands in ATM operations: introduction of a B-CDA trial at Manchester Airport
Cook, A.J. and Tanner, G. 2005. Attitudes t societal demands in ATM operations: introduction of a B-CDA trial at Manchester Airport. Cedex, France EUROCONTROL Experimental Centre. https://doi.org/EEC/SEE/2005/18
Understanding the true cost of delay to airline operators
Cook, A.J., Tanner, G. and Anderson, S. 2004. Understanding the true cost of delay to airline operators. Managing Airline Operating Costs Conference. Lisbon, Portugal 08 Dec 2004
Evaluating the true cost to airlines of one minute of airborne or ground delay: final report
Cook, A.J., Tanner, G. and Anderson, S. 2004. Evaluating the true cost to airlines of one minute of airborne or ground delay: final report. Brussels, Belgium Eurocontrol.
Analysing the potential impacts of sustainable distribution measures in UK urban areas
Allen, J., Browne, M., Tanner, G., Christodoulou, G. and Jones, P.M. 2004. Analysing the potential impacts of sustainable distribution measures in UK urban areas. in: Taniguchi, E. and Thompson, R.G. (ed.) Logistics systems for sustainable cities: proceedings of the 3rd International Conference on City Logistics (Madeira, Portugal, 25-27 June 2003) UK Elsevier.
Sustainable urban distribution: evaluating policy measures
Browne, M., Allen, J., Tanner, G., Anderson, S., Christodoulou, G. and Jones, P.M. 2003. Sustainable urban distribution: evaluating policy measures. Proceedings of the 8th Logistics Research Network Conference. London 10 - 12 Sep 2003
Modelling policy measures and company initiatives for sustainable urban distribution
Allen, J., Tanner, G., Browne, M., Anderson, S., Christodoulou, G. and Jones, P.M. 2003. Modelling policy measures and company initiatives for sustainable urban distribution. UK University of Westminster.
Conditional route implementation phase 1: AO use of CDRs
Cook, A.J., Tanner, G. and Anderson, S. 2001. Conditional route implementation phase 1: AO use of CDRs. UK University of Westminster.
Permalink - https://westminsterresearch.westminster.ac.uk/item/q4v46/saturn-d6-2-communication-and-dissemination-report